Per La Conner Municipal Code 12.15.030 and 12.10.060 (Town of La Conner Ordinance 1182 and Ordinance 1195) the 2022 Town of La Conner Water and Sewer Utility Rates have increased by 9.6%. Per La Conner Municipal Code 12.30.020 the 2022 Town of La Conner Storm Drain Rate has increased by 9.6%. Please see below for a list of various water, wastewater and storm drain projects that the increase in utility rates will support.
Water System Improvement Projects
Project Name | Description | Cost Estimate | Year |
AC Trans Main Phase 1 | Young to McLean pipe burst | $828,300 | 2018 |
S 1st Street Replacement | Commercial Street to Morris Street Replace AC and Size | $160,600 | 2018 |
S 3rd Street Replacement | 8" replacement from Washington to Douglas | $243,100 | 2019 |
AC Trans Main Phase 2 | Replace AC Main along La Conner-Whitney Rd | $2,592,700 | 2020 |
AC Trans Main Phase 3 | Roundabout to Reservoir | $1,870,000 | 2022 |
Rainier Street Replacement | Replace undersized line | $100,100 | 2023 |
N 4th Street Replacement | Replace 2" line from Center St to State St for Fire Flow | $132,000 | 2024 |
Wastewater System Improvement Projects
Project Name | Description | Cost Estimate | Year |
Plant Improvement | Rebuild Clarifier | $110,000 | 2019 |
Influent Screening | Upgrade | $220,000 | 2020 |
Plant Technical Upgrade | Next generation upgrade of water | $550,000 | 2022 |
Storm Water System Improvement Projects
Project Name | Description | Cost Estimate | Year |
Caledonia Pump Station | Retrofit existing wet well with 70 hp submersible pumps | $497,200 | 2018 |
S 3rd Street Extension | Caledonia to 250 lf east, connect culverts previously placed | $45,857 | 2018 |
Portable Generator | Trailer mounted Genset for pump station operation during power outage | $80,520 | 2019 |
Gap Fill Dike | Skagit River flood prevention dike along Drainage Ditch | $793,000 | 2019 |
Morris Street Pump Station Rebuild | Replace and rebuild two pumps | $97,790 | 2020 |
Whatcom/Laurel Drainage | 18", 12" and 8" along Whatcom from Washington south to Laurel, east to Maple Avenue | $215,367 | 2021 |