Per Town of La Conner Ordinance 1238 the 2024 Town of La Conner Sewer Base Rate increased by 6.9% and Sewer Usage Rate increased by 8%. The 2024 Town of La Conner Water Base Rate increased by 6.9%. The Town of La Conner Storm Drain Rate did not have an increase and remains the same as the 2023 rate. Please see below for a list of various water, wastewater and storm drain projects that the increase in utility rates will support.
Water System Improvement Projects
Project Name | Description | Cost Estimate | Year |
| AC Trans Main Phase 1 | Young to McLean pipe burst | $828,300 | 2018 |
| S 1st Street Replacement | Commercial Street to Morris Street Replace AC and Size | $160,600 | 2018 |
| S 3rd Street Replacement | 8" replacement from Washington to Douglas | $243,100 | 2019 |
| AC Trans Main Phase 2 | Replace AC Main along La Conner-Whitney Rd | $2,592,700 | 2020 |
| AC Trans Main Phase 3 | Roundabout to Reservoir | $1,870,000 | 2022 |
| Rainier Street Replacement | Replace undersized line | $100,100 | 2023 |
| N 4th Street Replacement | Replace 2" line from Center St to State St for Fire Flow | $132,000 | 2024 |
Wastewater System Improvement Projects
Project Name | Description | Cost Estimate | Year |
| Plant Improvement | Rebuild Clarifier | $110,000 | 2019 |
| Influent Screening | Upgrade | $220,000 | 2020 |
| Plant Technical Upgrade | Next generation upgrade of water | $550,000 | 2022 |
Storm Water System Improvement Projects
Project Name | Description | Cost Estimate | Year |
| Caledonia Pump Station | Retrofit existing wet well with 70 hp submersible pumps | $497,200 | 2018 |
| S 3rd Street Extension | Caledonia to 250 lf east, connect culverts previously placed | $45,857 | 2018 |
| Portable Generator | Trailer mounted Genset for pump station operation during power outage | $80,520 | 2019 |
| Gap Fill Dike | Skagit River flood prevention dike along Drainage Ditch | $793,000 | 2019 |
| Morris Street Pump Station Rebuild | Replace and rebuild two pumps | $97,790 | 2020 |
| Whatcom/Laurel Drainage | 18", 12" and 8" along Whatcom from Washington south to Laurel, east to Maple Avenue | $215,367 | 2021 |